PM Installation Inspection Checklist

PM Installation Inspection Checklist

PM Installation Inspection Checklist

  • MM slash DD slash YYYY
  • Installed CountNon Installed CountSize of non installed piece(s)Damage Count (Please Add Details and Pictures Below)Size of damaged piece(s)Rejected CountWhy Was The Pc or Pcs Rejected 
  • Notes

  • Drop files here or
    Max. file size: 10 MB.

    Graffiti Shield Logo

    Manufacturer of surface protection solution products for glass, metal, and solid surfaces. We specialize in precut anti-graffiti films for public and private spaces.

    Call Us

    Office location

    2940 La Palma #C, Anaheim, CA

    © 2024 Graffiti Shield Inc. All Rights Reserved.

    Skip to content